The contract comprised all associated ground works for a new build mess hall, a vehicle maintenance facility and a vehicle wash bay in a busy military barracks. This project required an immediate start so Pierse contacted Natta knowing of their flexibility and quick response from previous successfully completed jobs.
Scope of Works:
The initial mess building was added to with a vehicle maintenance
block and wash facility, all successfully completed within the required timescales.
The work included the site strip and pile cap formation in the in-situ layered rock. The construction of reinforced concrete
ground beams and slabs for the buildings, with a powerfloat finish. Installation of holding down bolts
for the steel super structure. Laying of more than 1km of foul drainage in clay and storm drainage.
Trenching, marking and backfill of a trench for electrical and data services. Installation of numerous service ducts and
connection of foul and storm water drainage. Channel drainage and installation of 2 no. petrol interceptor tanks.
Reinforced slab, brush finished to falls for the wash bays and associated deep water storage tanks for water recycling.
All kerbing and concrete works for an access road, block paving, gravel margins, topsoil and slabbing.