St. Georges Hospital
St. Georges Hospitals

Location: Tooting, London

Client: Metricab Power Engineering

Amount: £330,000

Duration: 4 months

Overview:
To construct an extension and undertake the modifications necessary to an existing stand by generator building ready for the installation of new standby generators and the associated cabling works within the grounds of the existing hospital.

Scope of Works:
Natta was appointed as the trade package contractor for all civil engineering and building works. The works included the construction of the new steel framed extension to the generator building. Excavation and concreting of the footings and the erection of steel frame and roof. All brickwork and mass filled concrete generator bases. The excavation and backfilling of cable trenches. Installation of cable ducts and pits associated with the LV 415 volt 3 phase distribution cables to the hospital and various sub stations.

St. Georges Hospital
St. Georges Hospital
St. Georges Hospital
St. Georges Hospital
St. Georges Hospital
St. Georges Hospital
'Rose Court', Rye Common Lane, Crondall, Farnham, Surrey GU10 5DD. T: 01252 851155