Project: Bracknell
Client:
Moss Construction
(a member of the Kier group of companies)
Project Value: £1.2 m
Duration: 5 months
Summary: This fast paced project consisted of the sub structure, drainage and all hard finishes for a data storage office block and multi-storey car park. The project includes 500 T of Steel and 4000m3 of concrete. Being a data storage facility there is extensive services work and the ground floor level is stepped with a suspended floor design.
Scope of Works:
The project involved the following works:-
Pilling mat installation - including geotextile;
CHD Pile break down;
Pile cap construction;
Extensive waterproofing (grace products - structure seal, granules
and Sheet seal 226);
Under slab cast iron drainage - both 4" and 6" pipe and 2No. in-situ
concrete manholes within the slab;
Service duct installation;
Building ground slab construction - including 4No. lift pits + 2No.
stair wells;
Multi storey car park ground slab (Brush finish) - including 70m long
retaining wall, 2No. stairs and 2No. vehicle ramps;
Drainage - Clay (various sizes) with associated concrete manholes;
Petrol interceptor installation.


|
|
|
![]() |
![]() |
|
|
![]() |
![]() |